BOMs Revision Management


Revision management provides the opportunity to make mass changes in the consumption lines in the bill of materials. For detailed information about the BOMs, you can review the "BOMs Design" document.


Route: ERP > Production > Production Design > Revisions


For Example; In the production of milk chocolate, one of the components is registered as powdered sugar, we want to revise the component as granulated sugar;


Necessary actions are taken on the Product Structure (BOM) Revision Management Screen;

Product Category: BOMs of products related to selected product categories are determined.

Product: In the product field, the product whose BOM will be revised is selected.

Spec: When adding, removing, and changing the BOM, all the specs of the detected product are changed and it updates the registered spec record without creating a new spec.

Operation: The operation can be selected in order to make changes under the relevant operation.

Brand: The brand of the product can be selected.

In the operation area, the area to be revised is selected.

  • If Remove is selected, the old product is removed.
  • If Add is selected, it adds the new product.
  • If change is selected, the new product is selected instead of the old product. With this option, the Update Quantity box becomes active.

Update Quantity: Based on the quantity entered on the new product side, it can be increased and decreased by percentage.

Alternative Question only works with Change function. If checked, alternative questions appear and selection can be made.


In the areas on the Right Side;

Product: In the first section, the product to be changed is selected in the BOM of the selected product.

New Product: The product to be defined is selected instead of the product to be changed.

Quantity: The quantity field is used to enter the amount of the product to be added or changed.

Note: If you do not select a product, it changes the BOM of the products in the category. If you select a product, it changes the product. When category and product are selected at the same time, the product is taken into account.

Tip: With the Update Production Orders parameter in the XML settings, if the product is not a customizable product, it also updates the production orders containing the relevant product.

After saving, a note will appear at the bottom of the page that the change has been made. Then you can enter the BOM and control.